      Dear All,
      to perform the deployment of the second external network in the Trento Node, we are planning a maintenance activity. If there are no issues,
      the activity will be planned tomorrow. Trentino Networks, that will perform the activity, will provide more details on the schedule.
      I assume it will not take more than one hour.

      Please let us know, by tomorrow 9 am, if we can proceed or should postpone.

      Thx,
      Federico


      Future Internet is closer than what you think!

      http://www.fi-ppp.eu
      http://www.fi-xifi.eu
      http://lab.fi-ware.eu


      Dr. Federico M. Facca

      CREATE-NET
      Via alla Cascata 56/D
      38123 Povo Trento (Italy)

      T +39 0461 408400 (1669)
      F +39 0461 421157
      M +39 334 6049758
      E federico.facca@create-net.org
      W www.create-net.org

      _______________________________________________
      Fiware-lab-help mailing list
      Fiware-lab-help@lists.fi-ware.org
      https://lists.fi-ware.org/listinfo/fiware-lab-help

        Activity

        ffacca Federico Michele Facca created issue -
        Hide
        FIWARE-LAB-HELP FIWARE-LAB-HELP added a comment -

        I do not see a particular issue, I am not aware of events tomorrow.

        Now that I think, I should warn everyone. Please note that here at
        Telefónica we work more hours in the winter to compensate that we leave
        at 3 pm in the summer. The communication by Federico is ok but if we get
        one at 4pm saying, "tomorrow will take all down at 7am, please complain
        if this is not feasible" we will not be able to reply on time.

        BR

        Miguel

        El 01/07/2014 16:57, Federico Michele Facca escribió:
        > Dear All,
        > to perform the deployment of the second external network in the Trento Node, we are planning a maintenance activity. If there are no issues,
        > the activity will be planned tomorrow. Trentino Networks, that will perform the activity, will provide more details on the schedule.
        > I assume it will not take more than one hour.
        >
        > Please let us know, by tomorrow 9 am, if we can proceed or should postpone.
        >
        > Thx,
        > Federico
        >
        > –
        > Future Internet is closer than what you think!
        >
        > http://www.fi-ppp.eu
        > http://www.fi-xifi.eu
        > http://lab.fi-ware.eu
        >


        ----------------------------------------------------------------------
        / _// Miguel Carrillo Pacheco
        _/ _/ _/ _/ Telefónica Distrito Telefónica
        / _//_/ _/ _/ Investigación y Edifico Oeste 1, Planta 9
        _/ _/ _/ _/ Desarrollo Ronda de la Comunicación S/N
        / _// 28050 Madrid (Spain)
        Tel: (+34) 91 483 26 77

        e-mail: mcp@tid.es

        Follow FI-WARE on the net

        Website: http://www.fi-ware.org
        Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242
        Twitter: http://twitter.com/Fiware
        LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932
        ----------------------------------------------------------------------

        ________________________________

        Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra política de envío y recepción de correo electrónico en el enlace situado más abajo.
        This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at:
        http://www.tid.es/ES/PAGINAS/disclaimer.aspx
        _______________________________________________
        Fiware-lab-help mailing list
        Fiware-lab-help@lists.fi-ware.org
        https://lists.fi-ware.org/listinfo/fiware-lab-help

        Show
        FIWARE-LAB-HELP FIWARE-LAB-HELP added a comment - I do not see a particular issue, I am not aware of events tomorrow. Now that I think, I should warn everyone. Please note that here at Telefónica we work more hours in the winter to compensate that we leave at 3 pm in the summer. The communication by Federico is ok but if we get one at 4pm saying, "tomorrow will take all down at 7am, please complain if this is not feasible" we will not be able to reply on time. BR Miguel El 01/07/2014 16:57, Federico Michele Facca escribió: > Dear All, > to perform the deployment of the second external network in the Trento Node, we are planning a maintenance activity. If there are no issues, > the activity will be planned tomorrow. Trentino Networks, that will perform the activity, will provide more details on the schedule. > I assume it will not take more than one hour. > > Please let us know, by tomorrow 9 am, if we can proceed or should postpone. > > Thx, > Federico > > – > Future Internet is closer than what you think! > > http://www.fi-ppp.eu > http://www.fi-xifi.eu > http://lab.fi-ware.eu > – ---------------------------------------------------------------------- / _/ / Miguel Carrillo Pacheco _/ _/ _/ _/ Telefónica Distrito Telefónica / _/ /_/ _/ _/ Investigación y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicación S/N / _/ / 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp@tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra política de envío y recepción de correo electrónico en el enlace situado más abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-lab-help mailing list Fiware-lab-help@lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-lab-help
        Hide
        ffacca Federico Michele Facca added a comment -

        Hi Miguel,
        of course we should not proceed if no ack is coming - either positie or
        negative. no "silence = consent" policy in this case... we are playing with
        users lives

        On Tue, Jul 1, 2014 at 5:42 PM, Miguel Carrillo <mcp@tid.es> wrote:

        > I do not see a particular issue, I am not aware of events tomorrow.
        >
        > Now that I think, I should warn everyone. Please note that here at
        > Telefónica we work more hours in the winter to compensate that we leave
        > at 3 pm in the summer. The communication by Federico is ok but if we get
        > one at 4pm saying, "tomorrow will take all down at 7am, please complain
        > if this is not feasible" we will not be able to reply on time.
        >
        > BR
        >
        > Miguel
        >
        >
        >
        >
        > El 01/07/2014 16:57, Federico Michele Facca escribió:
        >
        > Dear All,
        >> to perform the deployment of the second external network in the Trento
        >> Node, we are planning a maintenance activity. If there are no issues,
        >> the activity will be planned tomorrow. Trentino Networks, that will
        >> perform the activity, will provide more details on the schedule.
        >> I assume it will not take more than one hour.
        >>
        >> Please let us know, by tomorrow 9 am, if we can proceed or should
        >> postpone.
        >>
        >> Thx,
        >> Federico
        >>
        >> –
        >> Future Internet is closer than what you think!
        >>
        >> http://www.fi-ppp.eu
        >> http://www.fi-xifi.eu
        >> http://lab.fi-ware.eu
        >>
        >>
        > –
        > ----------------------------------------------------------------------
        > / _// Miguel Carrillo Pacheco
        > _/ _/ _/ _/ Telefónica Distrito Telefónica
        > / _//_/ _/ _/ Investigación y Edifico Oeste 1, Planta 9
        > _/ _/ _/ _/ Desarrollo Ronda de la Comunicación S/N
        > / _// 28050 Madrid (Spain)
        > Tel: (+34) 91 483 26 77
        >
        > e-mail: mcp@tid.es
        >
        > Follow FI-WARE on the net
        >
        > Website: http://www.fi-ware.org
        > Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242
        > Twitter: http://twitter.com/Fiware
        > LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932
        > ----------------------------------------------------------------------
        >
        >
        > ________________________________
        >
        > Este mensaje se dirige exclusivamente a su destinatario. Puede consultar
        > nuestra política de envío y recepción de correo electrónico en el enlace
        > situado más abajo.
        > This message is intended exclusively for its addressee. We only send and
        > receive email on the basis of the terms set out at:
        > http://www.tid.es/ES/PAGINAS/disclaimer.aspx
        >
        > _______________________________________________
        > Fiware-lab-help mailing list
        > Fiware-lab-help@lists.fi-ware.org
        > https://lists.fi-ware.org/listinfo/fiware-lab-help
        >


        Dr. Federico M. Facca

        CREATE-NET
        Via alla Cascata 56/D
        38123 Povo Trento (Italy)

        T +39 0461 408400 (1669)
        F +39 0461 421157
        M +39 334 6049758
        E federico.facca@create-net.org
        W www.create-net.org

        _______________________________________________
        Fiware-lab-help mailing list
        Fiware-lab-help@lists.fi-ware.org
        https://lists.fi-ware.org/listinfo/fiware-lab-help

        Show
        ffacca Federico Michele Facca added a comment - Hi Miguel, of course we should not proceed if no ack is coming - either positie or negative. no "silence = consent" policy in this case... we are playing with users lives On Tue, Jul 1, 2014 at 5:42 PM, Miguel Carrillo <mcp@tid.es> wrote: > I do not see a particular issue, I am not aware of events tomorrow. > > Now that I think, I should warn everyone. Please note that here at > Telefónica we work more hours in the winter to compensate that we leave > at 3 pm in the summer. The communication by Federico is ok but if we get > one at 4pm saying, "tomorrow will take all down at 7am, please complain > if this is not feasible" we will not be able to reply on time. > > BR > > Miguel > > > > > El 01/07/2014 16:57, Federico Michele Facca escribió: > > Dear All, >> to perform the deployment of the second external network in the Trento >> Node, we are planning a maintenance activity. If there are no issues, >> the activity will be planned tomorrow. Trentino Networks, that will >> perform the activity, will provide more details on the schedule. >> I assume it will not take more than one hour. >> >> Please let us know, by tomorrow 9 am, if we can proceed or should >> postpone. >> >> Thx, >> Federico >> >> – >> Future Internet is closer than what you think! >> >> http://www.fi-ppp.eu >> http://www.fi-xifi.eu >> http://lab.fi-ware.eu >> >> > – > ---------------------------------------------------------------------- > / _/ / Miguel Carrillo Pacheco > _/ _/ _/ _/ Telefónica Distrito Telefónica > / _/ /_/ _/ _/ Investigación y Edifico Oeste 1, Planta 9 > _/ _/ _/ _/ Desarrollo Ronda de la Comunicación S/N > / _/ / 28050 Madrid (Spain) > Tel: (+34) 91 483 26 77 > > e-mail: mcp@tid.es > > Follow FI-WARE on the net > > Website: http://www.fi-ware.org > Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 > Twitter: http://twitter.com/Fiware > LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 > ---------------------------------------------------------------------- > > > ________________________________ > > Este mensaje se dirige exclusivamente a su destinatario. Puede consultar > nuestra política de envío y recepción de correo electrónico en el enlace > situado más abajo. > This message is intended exclusively for its addressee. We only send and > receive email on the basis of the terms set out at: > http://www.tid.es/ES/PAGINAS/disclaimer.aspx > > _______________________________________________ > Fiware-lab-help mailing list > Fiware-lab-help@lists.fi-ware.org > https://lists.fi-ware.org/listinfo/fiware-lab-help > – Dr. Federico M. Facca CREATE-NET Via alla Cascata 56/D 38123 Povo Trento (Italy) T +39 0461 408400 (1669) F +39 0461 421157 M +39 334 6049758 E federico.facca@create-net.org W www.create-net.org _______________________________________________ Fiware-lab-help mailing list Fiware-lab-help@lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-lab-help
        Hide
        FIWARE-LAB-HELP FIWARE-LAB-HELP added a comment -

        Dear All,

        the scheduled activity on the Trento Node is going to take place from now on.
        The planned duration is three hours, the end of the maintenance will be notifyed.

        Regards,
        Matteo

        ----- Messaggio originale -----
        > Da: "Federico Michele Facca" <federico.facca@create-net.org>
        > A: fiware-lab-help@lists.fi-ware.org
        > Cc: "Giuseppe Cossu" <giuseppe.cossu@create-net.org>, tech-tn-xifi@trentinonetwork.it
        > Inviato: Martedì, 1 luglio 2014 16:57:44
        > Oggetto: TrentoNode
        >
        > Dear All,
        > to perform the deployment of the second external network in the
        > Trento Node, we are planning a maintenance activity. If there are no
        > issues,
        > the activity will be planned tomorrow. Trentino Networks, that will
        > perform the activity, will provide more details on the schedule.
        > I assume it will not take more than one hour.
        >
        > Please let us know, by tomorrow 9 am, if we can proceed or should
        > postpone.
        >
        > Thx,
        > Federico
        >
        > –
        > Future Internet is closer than what you think!
        >
        > http://www.fi-ppp.eu
        > http://www.fi-xifi.eu
        > http://lab.fi-ware.eu
        >
        > –
        > Dr. Federico M. Facca
        >
        > CREATE-NET
        > Via alla Cascata 56/D
        > 38123 Povo Trento (Italy)
        >
        > T +39 0461 408400 (1669)
        > F +39 0461 421157
        > M +39 334 6049758
        > E federico.facca@create-net.org
        > W www.create-net.org
        >
        >


        ==========================================================================
        Ing. Matteo Pastorelli
        Area Tecnologie ed Architetture
        Direzione Tecnica Tecnologie e Sistemi

        TRENTINO NETWORK S.R.L.
        Via G.Pedrotti, 18 – 38121 - TRENTO
        Tel (+39) 0461.020200
        Fax (+39) 0461.020201
        E-mail: matteo.pastorelli@trentinonetwork.it

        Cap. Soc. sottoscritto e i.v. euro 19.090.890,00

        • REG. IMP. C.F. e P. IVA 01904880224
          E-mail: sede@pec.trentinonetwork.it
          Società soggetta a direzione e controllo da parte della Provincia
          Autonoma di Trento. C.F. e P. IVA 00337460224
          _______________________________________________
          Fiware-lab-help mailing list
          Fiware-lab-help@lists.fi-ware.org
          https://lists.fi-ware.org/listinfo/fiware-lab-help
        Show
        FIWARE-LAB-HELP FIWARE-LAB-HELP added a comment - Dear All, the scheduled activity on the Trento Node is going to take place from now on. The planned duration is three hours, the end of the maintenance will be notifyed. Regards, Matteo ----- Messaggio originale ----- > Da: "Federico Michele Facca" <federico.facca@create-net.org> > A: fiware-lab-help@lists.fi-ware.org > Cc: "Giuseppe Cossu" <giuseppe.cossu@create-net.org>, tech-tn-xifi@trentinonetwork.it > Inviato: Martedì, 1 luglio 2014 16:57:44 > Oggetto: TrentoNode > > Dear All, > to perform the deployment of the second external network in the > Trento Node, we are planning a maintenance activity. If there are no > issues, > the activity will be planned tomorrow. Trentino Networks, that will > perform the activity, will provide more details on the schedule. > I assume it will not take more than one hour. > > Please let us know, by tomorrow 9 am, if we can proceed or should > postpone. > > Thx, > Federico > > – > Future Internet is closer than what you think! > > http://www.fi-ppp.eu > http://www.fi-xifi.eu > http://lab.fi-ware.eu > > – > Dr. Federico M. Facca > > CREATE-NET > Via alla Cascata 56/D > 38123 Povo Trento (Italy) > > T +39 0461 408400 (1669) > F +39 0461 421157 > M +39 334 6049758 > E federico.facca@create-net.org > W www.create-net.org > > – ========================================================================== Ing. Matteo Pastorelli Area Tecnologie ed Architetture Direzione Tecnica Tecnologie e Sistemi TRENTINO NETWORK S.R.L. Via G.Pedrotti, 18 – 38121 - TRENTO Tel (+39) 0461.020200 Fax (+39) 0461.020201 E-mail: matteo.pastorelli@trentinonetwork.it Cap. Soc. sottoscritto e i.v. euro 19.090.890,00 REG. IMP. C.F. e P. IVA 01904880224 E-mail: sede@pec.trentinonetwork.it Società soggetta a direzione e controllo da parte della Provincia Autonoma di Trento. C.F. e P. IVA 00337460224 _______________________________________________ Fiware-lab-help mailing list Fiware-lab-help@lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-lab-help
        Hide
        FIWARE-LAB-HELP FIWARE-LAB-HELP added a comment -

        Dear All,

        the maintenance activity can be considered successfully concluded. Trento Node is up & running with the second external network.

        Regards,

        Matteo

        ----- Messaggio originale -----
        > Da: "Matteo Pastorelli" <matteo.pastorelli@trentinonetwork.it>
        > A: fiware-lab-help@lists.fi-ware.org
        > Cc: "Giuseppe Cossu" <giuseppe.cossu@create-net.org>, tech-tn-xifi@trentinonetwork.it, "Federico Michele Facca"
        > <federico.facca@create-net.org>
        > Inviato: Mercoledì, 2 luglio 2014 9:54:19
        > Oggetto: Re: TrentoNode
        >
        > Dear All,
        >
        > the scheduled activity on the Trento Node is going to take place from
        > now on.
        > The planned duration is three hours, the end of the maintenance will
        > be notifyed.
        >
        > Regards,
        > Matteo
        >
        > ----- Messaggio originale -----
        > > Da: "Federico Michele Facca" <federico.facca@create-net.org>
        > > A: fiware-lab-help@lists.fi-ware.org
        > > Cc: "Giuseppe Cossu" <giuseppe.cossu@create-net.org>,
        > > tech-tn-xifi@trentinonetwork.it
        > > Inviato: Martedì, 1 luglio 2014 16:57:44
        > > Oggetto: TrentoNode
        > >
        > > Dear All,
        > > to perform the deployment of the second external network in the
        > > Trento Node, we are planning a maintenance activity. If there are
        > > no
        > > issues,
        > > the activity will be planned tomorrow. Trentino Networks, that will
        > > perform the activity, will provide more details on the schedule.
        > > I assume it will not take more than one hour.
        > >
        > > Please let us know, by tomorrow 9 am, if we can proceed or should
        > > postpone.
        > >
        > > Thx,
        > > Federico
        > >
        > > –
        > > Future Internet is closer than what you think!
        > >
        > > http://www.fi-ppp.eu
        > > http://www.fi-xifi.eu
        > > http://lab.fi-ware.eu
        > >
        > > –
        > > Dr. Federico M. Facca
        > >
        > > CREATE-NET
        > > Via alla Cascata 56/D
        > > 38123 Povo Trento (Italy)
        > >
        > > T +39 0461 408400 (1669)
        > > F +39 0461 421157
        > > M +39 334 6049758
        > > E federico.facca@create-net.org
        > > W www.create-net.org
        > >
        > >
        >
        > –
        > ==========================================================================
        > Ing. Matteo Pastorelli
        > Area Tecnologie ed Architetture
        > Direzione Tecnica Tecnologie e Sistemi
        >
        >
        > TRENTINO NETWORK S.R.L.
        > Via G.Pedrotti, 18 – 38121 - TRENTO
        > Tel (+39) 0461.020200
        > Fax (+39) 0461.020201
        > E-mail: matteo.pastorelli@trentinonetwork.it
        >
        > Cap. Soc. sottoscritto e i.v. euro 19.090.890,00
        > - REG. IMP. C.F. e P. IVA 01904880224
        > E-mail: sede@pec.trentinonetwork.it
        > Società soggetta a direzione e controllo da parte della Provincia
        > Autonoma di Trento. C.F. e P. IVA 00337460224
        >


        ==========================================================================
        Ing. Matteo Pastorelli
        Area Tecnologie ed Architetture
        Direzione Tecnica Tecnologie e Sistemi

        TRENTINO NETWORK S.R.L.
        Via G.Pedrotti, 18 – 38121 - TRENTO
        Tel (+39) 0461.020200
        Fax (+39) 0461.020201
        E-mail: matteo.pastorelli@trentinonetwork.it

        Cap. Soc. sottoscritto e i.v. euro 19.090.890,00

        • REG. IMP. C.F. e P. IVA 01904880224
          E-mail: sede@pec.trentinonetwork.it
          Società soggetta a direzione e controllo da parte della Provincia
          Autonoma di Trento. C.F. e P. IVA 00337460224
          _______________________________________________
          Fiware-lab-help mailing list
          Fiware-lab-help@lists.fi-ware.org
          https://lists.fi-ware.org/listinfo/fiware-lab-help
        Show
        FIWARE-LAB-HELP FIWARE-LAB-HELP added a comment - Dear All, the maintenance activity can be considered successfully concluded. Trento Node is up & running with the second external network. Regards, Matteo ----- Messaggio originale ----- > Da: "Matteo Pastorelli" <matteo.pastorelli@trentinonetwork.it> > A: fiware-lab-help@lists.fi-ware.org > Cc: "Giuseppe Cossu" <giuseppe.cossu@create-net.org>, tech-tn-xifi@trentinonetwork.it, "Federico Michele Facca" > <federico.facca@create-net.org> > Inviato: Mercoledì, 2 luglio 2014 9:54:19 > Oggetto: Re: TrentoNode > > Dear All, > > the scheduled activity on the Trento Node is going to take place from > now on. > The planned duration is three hours, the end of the maintenance will > be notifyed. > > Regards, > Matteo > > ----- Messaggio originale ----- > > Da: "Federico Michele Facca" <federico.facca@create-net.org> > > A: fiware-lab-help@lists.fi-ware.org > > Cc: "Giuseppe Cossu" <giuseppe.cossu@create-net.org>, > > tech-tn-xifi@trentinonetwork.it > > Inviato: Martedì, 1 luglio 2014 16:57:44 > > Oggetto: TrentoNode > > > > Dear All, > > to perform the deployment of the second external network in the > > Trento Node, we are planning a maintenance activity. If there are > > no > > issues, > > the activity will be planned tomorrow. Trentino Networks, that will > > perform the activity, will provide more details on the schedule. > > I assume it will not take more than one hour. > > > > Please let us know, by tomorrow 9 am, if we can proceed or should > > postpone. > > > > Thx, > > Federico > > > > – > > Future Internet is closer than what you think! > > > > http://www.fi-ppp.eu > > http://www.fi-xifi.eu > > http://lab.fi-ware.eu > > > > – > > Dr. Federico M. Facca > > > > CREATE-NET > > Via alla Cascata 56/D > > 38123 Povo Trento (Italy) > > > > T +39 0461 408400 (1669) > > F +39 0461 421157 > > M +39 334 6049758 > > E federico.facca@create-net.org > > W www.create-net.org > > > > > > – > ========================================================================== > Ing. Matteo Pastorelli > Area Tecnologie ed Architetture > Direzione Tecnica Tecnologie e Sistemi > > > TRENTINO NETWORK S.R.L. > Via G.Pedrotti, 18 – 38121 - TRENTO > Tel (+39) 0461.020200 > Fax (+39) 0461.020201 > E-mail: matteo.pastorelli@trentinonetwork.it > > Cap. Soc. sottoscritto e i.v. euro 19.090.890,00 > - REG. IMP. C.F. e P. IVA 01904880224 > E-mail: sede@pec.trentinonetwork.it > Società soggetta a direzione e controllo da parte della Provincia > Autonoma di Trento. C.F. e P. IVA 00337460224 > – ========================================================================== Ing. Matteo Pastorelli Area Tecnologie ed Architetture Direzione Tecnica Tecnologie e Sistemi TRENTINO NETWORK S.R.L. Via G.Pedrotti, 18 – 38121 - TRENTO Tel (+39) 0461.020200 Fax (+39) 0461.020201 E-mail: matteo.pastorelli@trentinonetwork.it Cap. Soc. sottoscritto e i.v. euro 19.090.890,00 REG. IMP. C.F. e P. IVA 01904880224 E-mail: sede@pec.trentinonetwork.it Società soggetta a direzione e controllo da parte della Provincia Autonoma di Trento. C.F. e P. IVA 00337460224 _______________________________________________ Fiware-lab-help mailing list Fiware-lab-help@lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-lab-help
        mev Manuel Escriche made changes -
        Field Original Value New Value
        Assignee Manuel Escriche [Administrator] [ mev ] Miguel Carrillo Pacheco [ mcp ]
        ffacca Federico Michele Facca made changes -
        Status To Do [ 10001 ] Done [ 10000 ]
        Resolution Done [ 10000 ]
        mev Manuel Escriche made changes -
        Component/s FIWARE-LAB-HELP [ 10279 ]
        mev Manuel Escriche made changes -
        Workflow Basic Workflow [ 12473 ] FW eRequest Workflow [ 16143 ]
        Issue Type Question [ 10004 ] eRequest [ 10101 ]
        FI-WARE Environment FI-LAB [ 10100 ]
        Resolution Done [ 10000 ]
        mev Manuel Escriche made changes -
        Resolution Done [ 10000 ]
        mev Manuel Escriche made changes -
        Workflow FW eRequest Workflow [ 16143 ] eRequest Workflow-2 [ 16673 ]
        mev Manuel Escriche made changes -
        Status Done [ 10000 ] In Progress [ 3 ]
        mev Manuel Escriche made changes -
        Status In Progress [ 3 ] Done [ 10000 ]
        mev Manuel Escriche made changes -
        Workflow eRequest Workflow-2 [ 16673 ] FW eRequest Workflow [ 17030 ]
        mev Manuel Escriche made changes -
        Fix Version/s Sprint 4.1.1 [ 10737 ]
        mev Manuel Escriche made changes -
        Issue Type eRequest [ 10101 ] extRequest [ 10104 ]
        Workflow FW eRequest Workflow [ 17030 ] FW extRequest Workflow-II [ 40916 ]
        Status Done [ 10000 ] Closed [ 6 ]
        backlogmanager Backlog Manager made changes -
        Summary [Fiware-lab-help] TrentoNode FIWARE.Request.Lab.TrentoNode
        mev Manuel Escriche made changes -
        Component/s FIWARE-GENERAL-HELP [ 10277 ]
        Component/s FIWARE-LAB-HELP [ 10279 ]
        backlogmanager Backlog Manager made changes -
        Summary FIWARE.Request.Lab.TrentoNode FIWARE.Request.General.FIWARE.Request.Lab.TrentoNode
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        To Do To Do Done Done
        6d 19h 27m 1 Federico Michele Facca 01/Oct/14 10:01 AM
        Done Done In Progress In Progress
        21d 12h 27m 1 Manuel Escriche 22/Oct/14 10:29 PM
        In Progress In Progress Done Done
        1m 50s 1 Manuel Escriche 22/Oct/14 10:31 PM
        Done Done Closed Closed
        446d 11h 38m 1 Manuel Escriche 12/Jan/16 9:10 AM

          People

          • Assignee:
            mcp Miguel Carrillo
            Reporter:
            ffacca Federico Michele Facca
          • Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

            • Created:
              Updated:
              Resolved: